Latest status on the A4 highway's traffic flow
Motorists are advised of upcoming traffic disruptions at the Görlitz interchanges Bautzen-Ost and Bautzen-West on August 12th and 13th, 2025. These disruptions are due to surveying work being conducted.
Affected Areas
The interchanges affected by these disruptions are: - Görlitz interchange Bautzen-Ost - Görlitz interchange Bautzen-West
Expected Impact
During the work, motorists can expect lane closures or reduced lanes at both interchanges. There may also be temporary stoppages or traffic signals controlling the flow of traffic. The restrictions are expected to impact traffic moving in and out of Bautzen, especially on major connecting highways.
Detour Routes
For drivers coming from or going to Bautzen via the interchanges, alternative routes will be provided. Local detours will be signposted on-site to guide traffic around the construction zones. Suggested alternate corridors may include regional roads bypassing the affected interchanges to the north or south, depending on your direction of travel. It is advisable for long-distance travelers to plan extra travel time and consider using alternate highways if possible.
Inbound Traffic Detours
On August 12th and 13th, 2025, inbound traffic will use the signposted diversion U2. On August 13th, 2025, outbound traffic on the interchange Bautzen-West will be closed, and traffic will be redirected via the signposted diversion U2.
Outbound Traffic Detours
On August 12th, 2025, outbound traffic will be detoured via the previous interchange Bautzen-West and the next interchange Weißenberg. On August 13th, 2025, outbound traffic will be detoured via the next interchange Bautzen-Ost. No traffic restrictions are expected in the direction of Goerlitz at the interchange Bautzen-Ost on August 13th, 2025. However, on August 13th, 2025, traffic restrictions will occur in the direction of Goerlitz at the interchange Bautzen-West due to surveying work.
Work Schedule
The surveying work will take place from 08:00 to 17:00 on both days, August 12th and 13th, 2025.
Important Notice
Because detailed official traffic notices and signage will be posted closer to the dates, checking local traffic authority updates for exact detour maps and timing is recommended before traveling on these dates.
Read also:
- Stone mining has transformed the once renowned 'Sada Pathor' into a desolate, post-apocalyptic landscape.
- Financial regulatory body OCC imposes Anti-Money Laundering (AML) disciplinary action against Wells Fargo.
- Revised Tax Policy for Motor Vehicles Pushed for Greater Eco-friendliness, Suggested by Court Auditors
- The Fate of the Standard Dodge Charger Daytona Electric Vehicle