Skip to content

Paved walkway constructed in Mlodekno, halts short of the stop by several meters.

Lesnoye microdistrict resident offers complaint to Kraj.by news outlet

Lesny microdistrict resident contacts Kraj.by with their concerns
Lesny microdistrict resident contacts Kraj.by with their concerns

Paved walkway constructed in Mlodekno, halts short of the stop by several meters.

On Yakuba Kolasa Street in Lesnye, a partial completion of a pedestrian path has led to challenges for public transportation users. Despite the newly constructed walkway, an incomplete segment near a bus stop poses safety concerns and inconvenience.

The unfinished portion of the path ends several meters shy of the bus stop, leaving commuters to navigate through puddles and around construction debris. Additionally, a trash can obstructs the paved area, forcing pedestrians to deviate from their path.

Observation of the worn-down grass indicates heavy foot traffic in this area. Victor, a local resident, expressed frustration that the construction teams may not have considered the potential issues this section of the path would cause.

Measuring approximately 10 meters in length, the puddle, albeit slightly shorter, creates hazardous conditions for those relying on public transport. With the incomplete and problematic pedestrian path, commuters face unsafe crossings, gaps in the sidewalk, and potential conflicts with traffic.

The ongoing construction and planning challenges in Lesnye have left certain segments of the pedestrian path in an inadequate state, hindering the easy and secure access to transit points along the street. Ultimately, the lack of a continuous, safe pedestrian walkway causes inconvenience and safety concerns for public transportation users.

The ongoing construction along Yakuba Kolasa Street in Lesnye not only affects the public transit industry by causing inconvenience but also endangers those who rely on it, as the unfinished pedestrian path presents hazardous conditions due to the 10-meter long puddle and the obstructed paved area. Moreover, Victor, a local resident, expresses concerns that the construction teams may have overlooked the potential issues this incomplete segment of the path might cause for the finance sector, as it affects the ease of movement and safety during public transit usage.

Read also:

    Latest